Planning Process

Module 5 in two parts. Start with Part A, then Part B. Keep the quick references open while you work.

Module 5 throughline · A scope is a promise. Planning turns it into a plan you can run: broken down, priced, sequenced, staffed, and measurable.
Async + VirtualTwo partsBreak down · Sequence · Staff

What you will be able to do

  • Define scope, schedule, budget, and constraints based on client goals.
  • Build a Work Breakdown Structure (WBS).
  • Identify QA/QC requirements and checkpoints within the project plan.
  • Sequence the work with Logic-Based / Pull Planning so information reaches each discipline on time.
  • Build a work plan with workload, resource demand, and fee-forecasting elements.
  • Apply Earned Value concepts to measure plan performance.

Tools & resources

Tools & resources you will use

  • Project Planning Process
  • WBS Template for Standard Projects
  • Project Decision Matrix
  • Work Plan & Schedule Template
  • Earned Value Plan / S-curve

Listed items are the governance and operational tools tied to this section. Items marked “Participant generated” are built during the work.

The Archetype Lens

Before the design starts, two archetypes skip the breakdown.

Breaking down the work is exactly the discipline the Obsessed Designer rushes past and the Coordinator over-documents.

At risk here

Competent Coordinator

Logs and documents instead of intervening, trusting the meeting cadence over the timely call.

At risk here

Obsessed Designer

Optimizes for the design, treating budget, client ops, and team load as someone else’s problem.

People Pleaser

Leads with relationship, says yes, softens bad news, and absorbs cost to avoid the hard conversation.

Accountable Owner

Owns the intersections, reads signals early, stops work, presents options, and protects the outcome.

The situation

A new phase starts and the design is exciting.

✗ The Obsessed Designer move

Dives into design without breaking the work down or pricing it.

✓ The Owner move

Decomposes the scope into a WBS and prices it before the first sketch, so design gets the runway a real budget buys.

The situation

Estimating who should do a routine task.

✗ The Competent Coordinator move

Builds a tidy plan but never soft-resources to the right level.

✓ The Owner move

Assigns each task to its lowest competent role and defends the margin task by task.


Meet the four archetypes in depth →