Grace Design Studios · Module 10 of 12

Change & Quality Control

Managing Change & Quality · Companion Reference & Interactive Tools

Is it a change?The 5-step change modelThe oversight systemQA by discipline

Is it a change? Run the boundary test

The size of the request does not decide whether it is a change. One question does: has the boundary of the project moved? Check anything appearing on the project.

Signals the boundary moved

No boundary movement checked. Stay alert: small adjustments are what slip through unmanaged.

The 5-Step Change Model

Effective change management starts at the beginning of the project. Set the first four steps up front. Run step 5 every time the boundary moves.

1

Educate the client

Name the change reality early. Ask their preferred process for changes to scope, schedule, fee, deliverables, field conditions.

2

Tracking system

Stand up the Change Log (CTS). Record every change, asked-for or not.

3

Establish review periods

Name the milestones (SD, DD, 30/60/90% CD) that, once accepted, lock prior work. Rework after a review period earns compensation.

4

Additional services

Agree up front who can authorize added scope and how it is priced.

5

Document & share

Document each change and decision. Share internally and with the client.

!
Change order before the work, not at invoicing.

Address changes in real time and submit the change order before doing the work. Approved changes adjust schedule and budget. The sequence of activities stays intact even as dates move. Do not work for free.

The change log & getting credit

The Change Tracking System makes sure the firm gets credit for every change and ties each back to a contract provision.

DateDescriptionReasonCost of changeSchedule impactAS#
Jul 15Modify cut/fill at exteriorGC request, VE$2,800Deadline delay·
Aug 3Change exterior materialReduce cost$8001 week·
Sep 12 added coordination meetingsClient request$1,400No time·
Always get credit.

Log all changes, including ones the firm chooses not to bill. A recorded change the firm absorbed is documented goodwill. A silent one is lost margin.

Read the client’s contracting culture. It changes how the firm pursues credit:

Public (e.g., City of Oakhaven)

  • Formal, process over relationship
  • Multiple stakeholders, route PM → Contracting Officer
  • Requires their documentation, note at invoicing
  • Plan change orders as a formal step

Private

  • Less formal, often a single decider
  • Relationship-influenced
  • Requires your documentation, revisit at invoicing
  • Educate early to keep changes collaborative

Negotiating an additional service: lead with an open question to learn how the client wants to proceed, then offer two clear paths forward (each acceptable to the firm).

The oversight system · three steps

Quality fails when the review system disappears under pressure, not because the system is missing. The PM ensures it happens.

1

Establish the review

Before work begins: what needs review, who (independent of author), when in the schedule, and any stamp / agency / safety requirements.

2

Follow the protocol

Use the existing checklists and sign-offs. Confirm reviewers before the phase. Protect the review time when the schedule tightens.

3

Close the loop

Confirm every comment is fully resolved before issue. An open comment that ships returns at permit.

Review time that is not planned into the schedule disappears when pressure rises. Plan it. Protect it.

QA by discipline

Each discipline carries its own review checklist. The PM confirms the right one is used, by an independent reviewer, before issue.

DisciplineReview focus (typical)
ArchitecturalCode, drawing coordination, completeness against the deliverable list
StructuralCalculations, framing coordination with arch/MEP
MechanicalEquipment sizing, clearances, conflicts with structure/ceilings
ElectricalLoads, panel/feeder coordination, code compliance
PlumbingFixture counts, routing, slope and coordination
Fire protectionCoverage, code/agency requirements, coordination

Cross-discipline coordination reviews catch the conflicts single-discipline checks miss, such as the mechanical-vs-structural clash that surfaces at permit.